Tuesday, December 28, 2010

Construction: Day 22 Pt. II

Bill Heinemann, and Chris and Daniel Patrick remove the sheetrock from the walls of the Pastor's Study. The picture looks grainy because the camera captured all the dust in the air.

The stripped down, bare-bones, carpet-less Pastor's Study.

The excavator showed up after dark to begin to clear away more earth.

The sidewalk leading to the main entryway comes up.

No comments:

Post a Comment