Wednesday, March 30, 2011

Link and Entry

Korey and Kelley Kern continue to sheetrock the new link.

Mike Johnson drops the entryway ceiling so that electrical can be installed.

Lift

The control panel for the new lift was installed today.

The platform for the lift was also installed.

Tuesday, March 29, 2011

Sheetrock & Insulation

Kerry and Korey Kern and Mike Protelsch began sheetrocking the new link today.

Korey trims a piece of sheetrock to size. Sheetrocking is dusty, messy work, as you can see all the dust that is created here.

Mike Johnson went to work framing another room on the second level of the addition.

Norm Glewwe cuts pieces of insulation to size and then Matt Glewwe and Rick Hillegas put them in place in the rafters.


Monday, March 28, 2011

Day 86

June Glewwe stains some of the woodwork that was removed and then replaced.

Kerry Kern enjoys the afternoon sun while installing sheetrock in the new stairwell.

Some of the machinery and equipment for the new lift is in the process of being installed.

Friday, March 25, 2011

More Sheetrock and Some Painting

Kelley and Korey Kern and Mike Protelsch work on sheetrocking the stairwell of the new addition.

All of the sheetrocking on the second level of the addition has been completed.

One of the bathrooms on the second level of the addition.

Norm Glewwe sweeps up the dust created by the sheetrocking process.

Pastor Lang tapes off some of the woodwork in the preschool rooms in preparation for paint.

Rick Hillegas goes to work with the roller.

Tuesday, March 22, 2011

Sheetrock

Korey Kern screws sheetrock in place in the new lift. Notice all the dust in the air captured by the camera.

Kerry Kern cuts the sheetrock to size and feeds the pieces in to Korey.

Mike Protelsch stands on scaffolding to attach pieces of sheetrock to the harder to reach areas of the lift shaft.

Kerry Kern puts the finishing touches on the sheetrock in the lift shaft.


Kelley Kern attaches some smaller pieces of sheetrock to the exterior of the elevator shaft in the addition.

The elevator shaft in the new building has now been completely sheetrocked.

Saturday, March 19, 2011

Riverview Men and Women Get To Work

Joy Lang staples poly membrane to the studs. The membrane will protect the sheetrock from moisture.

Tim Olson and Kerry Kern joke around as Kerry applies an adhesive for the membrane.

Tim staples the membrane to the studs.

Matt Conway cuts the membrane into appropriately sized sheets to fit the walls in the small rooms on the first level of the addition.

Mike Johnson applies adhesive to the base of the walls on the second level in preparation for the membrane.

Work moves up to the second level, and Tim Olson and Matt Conway have at it.

Friday, March 18, 2011

Getting Our Hands dirty

Riverview guys volunteer some time to insulate the second level of the addition.



Day 80

A worker heats up a pipe to be installed.

Insulation has been put in place on the second level of the new addition.

Workers install doors in the new link.

All of the windows for the new link have been installed.

Kerry Kern does the "mudding" for the newly hung sheetrock in the Narthex.

Wednesday, March 16, 2011

Cement

A cement truck showed up this morning to pour cement in the front entryway and the new link.


Exterior Progress

Here's an exterior look at the entryway, link, and addition. As you can see, all the windows in the addition have been installed.


Framing and Sheetrock

Mike Johnson surveys his framing work for the new lift. The dark square at the bottom of the shaft is newly poured concrete.

Korey Kern puts some elbow grease into removing a fixture to prepare to sheetrock a wall in the narthex.

Tuesday, March 15, 2011

Painting

Larry Vidger, Chris Patrick, and Rich Factor go to work painting sprinkler pipes in the Fellowship Hall.


Woodwork

Rich Factor makes careful cuts on the woodwork that was removed from the Narthex wall.

Rich reapplies the wood to the wall. This is the new location of the information and welcome center.