Saturday, March 19, 2011

Riverview Men and Women Get To Work

Joy Lang staples poly membrane to the studs. The membrane will protect the sheetrock from moisture.

Tim Olson and Kerry Kern joke around as Kerry applies an adhesive for the membrane.

Tim staples the membrane to the studs.

Matt Conway cuts the membrane into appropriately sized sheets to fit the walls in the small rooms on the first level of the addition.

Mike Johnson applies adhesive to the base of the walls on the second level in preparation for the membrane.

Work moves up to the second level, and Tim Olson and Matt Conway have at it.