Monday, January 17, 2011

Days 34 & 35

The power at the church was out at the end of last week, so picture taking and posting were delayed. But here's what happened at the end of last week. The walls for the second level begin to go up.



The lower level is now completely enclosed and is being heated. As of Sunday, the temperature in the lower level of the addition was 51 degrees.

Relocating a circuit breaker box to the mechanical room in the basement.

Noah Gordon and Bill Heinemann take down ceiling tiles in the upstairs youth room.

No comments:

Post a Comment