Friday, February 4, 2011

Demo.

Lots of concrete is flying. A hard hat is a good idea if you're going to be around the church during the week.

Makeshift signs like this appear in places throughout the church where demolition work needs to be done.

Cutting through the concrete blocks to prepare the area for the new lift.

Taking a break.

Here you can see into the Music Office, the floor of the office, and then into the storage closet in the basement. The new lift will provide access to the basement level and the Fireside Room and Sanctuary platform.

After the section of wall was removed, the hole was boarded up to make sure nobody falls through.

The tile below the carpet in the Music Office was asbestos based, so some precautions are being taken.