Monday, February 21, 2011

Sprinklers

The weekend brought 12 inches of new snow with it, so not much work was taking place outside on Monday morning.

The sprinkler crew continued to install the new sprinkler system on Monday morning. Here a worker is drilling a big hole through a wall in one of the nursery rooms. Pipes will run down the nursery hallway and sprinklers will be installed on the walls of each nursery and preschool room.

The pipes and equipment for the sprinkler system that will be installed in the sanctuary.

Workers install pipe for the sprinkler system at the very top of the sanctuary ceiling.



Some pews had to be removed so the lift could be properly positioned.

The black pipe running diagonally through the picture is the main pipe that will feed the sprinkler system in the sanctuary.

No comments:

Post a Comment