Monday, April 18, 2011

Elevator

A look down the elevator shaft from the second level.

The controls for the elevator have been installed.

Ray Glewwe takes a short ride down the elevator.

Tuesday, March 22, 2011

Sheetrock

Korey Kern screws sheetrock in place in the new lift. Notice all the dust in the air captured by the camera.

Kerry Kern cuts the sheetrock to size and feeds the pieces in to Korey.

Mike Protelsch stands on scaffolding to attach pieces of sheetrock to the harder to reach areas of the lift shaft.

Kerry Kern puts the finishing touches on the sheetrock in the lift shaft.


Kelley Kern attaches some smaller pieces of sheetrock to the exterior of the elevator shaft in the addition.

The elevator shaft in the new building has now been completely sheetrocked.

Friday, March 18, 2011

Getting Our Hands dirty

Riverview guys volunteer some time to insulate the second level of the addition.



Friday, March 4, 2011

Progress...

The sprinkler system that was installed in the sanctuary has been painted. While the pipes are still visible, they now blend in nicely with the woodwork.

The ceiling of the second floor of the addition has been completely sheetrocked.

The location of the elevator on the second level.

Monday, January 17, 2011

Day 36

By Monday, almost the entire second story of the addition had been walled in.


The enclosed, heated lower level of the addition.

The storage closet in the basement has been removed to make way for the new lift.

Wednesday, January 12, 2011

Construction: Day 33

A view of the shelled addition from the lower parking lot.
















A view from the upper lot.
















A view inside the lower level of the new addition.

The location of the new elevator.

Friday, December 17, 2010

Construction: Days 14 & 15

The site has been completely backfilled as of Day 15. The stacks of concrete blocks are for the exterior (above ground) walls.

Another picture of the backfilled work site. The location of the elevator is on the lower left. The "tent" on the left hand side is where the builders are currently working, laying blocks to create the southern wall of the new addition.

The northern exterior wall of the new addition.




















Ceiling panels are removed in the Nursery Wing for inspections and to make plans for the church's new sprinkler system.


More filling and smoothing on Day 14


Tuesday, December 14, 2010

Construction: Day 12

Prepping for more concrete blocks.




















Waterproofing the concrete blocks after they have been cemented in place. These blocks will be buried underground, so it is important that they remain free of moisture.






The footings are closed to finished. Backfilling will begin this week.






Location of the new elevator.





More evidence of the recent blizzard.

Monday, December 6, 2010

Construction: Day 6

Cement trucks preparing to pour the footings of the new addition.













The poured footings. The large square of cement is the location of the new elevator.













The front entryway continues to be dismantled, at the hands of Ray Glewwe and Chris Patrick.

Friday, December 3, 2010

Construction: Day 5

The forms for the footings of the new addition.

The location of the new elevator.

The front entryway on Day 3:

The front entryway on Day 5: