Sweeping on the construction site is dirty work. With so much dust in the air, it's hard to see how he's even making any progress!
Showing posts with label Video. Show all posts
Showing posts with label Video. Show all posts
Wednesday, May 4, 2011
More Digging
More digging had to be done to continue to connect the church's new water service for the sprinkler system. Pipes will be laid in these ditches and connected to the water supply in the street.
Saturday, April 30, 2011
IT Guys
The IT crew (Rich Erickson, Craig Hillegas, Tim Olson, Lee Dodge, and Kerry Glewwe) put in some time on Saturday to run all the wiring necessary for the new computer system in the addition.
This is just a fraction of the wires and cables that are running through the ceiling of the addition.
Craig, Tim, and Lee feed cables through the ceiling. There are going to be a few guys with sore necks and shoulders tomorrow.
This is just a fraction of the wires and cables that are running through the ceiling of the addition.
Craig, Tim, and Lee feed cables through the ceiling. There are going to be a few guys with sore necks and shoulders tomorrow.
Friday, April 29, 2011
The Youth Room is a Pit
Crews had to dig a hole through the floor of the Youth Room to connect to the new water service that will feed the sprinkler system. The pipes go through the Youth Room, out of the church, and down the hill to Gorman Ave.
Saturday, April 23, 2011
Bathroom Tile
Todd and Alissa Bak, along with Matt Glewwe and Rich and Kyle Factor volunteer their Saturday morning to put down tile in the two bathrooms on the second floor of the addition.
Monday, April 18, 2011
Elevator
A look down the elevator shaft from the second level.
The controls for the elevator have been installed.
Ray Glewwe takes a short ride down the elevator.
The controls for the elevator have been installed.
Ray Glewwe takes a short ride down the elevator.
Friday, April 8, 2011
Second Floor Walk Thru
Here's a short video walk thru of the second floor of the new addition.
Tuesday, March 22, 2011
Sheetrock
Korey Kern screws sheetrock in place in the new lift. Notice all the dust in the air captured by the camera.
Kerry Kern cuts the sheetrock to size and feeds the pieces in to Korey.
Mike Protelsch stands on scaffolding to attach pieces of sheetrock to the harder to reach areas of the lift shaft.
Kerry Kern puts the finishing touches on the sheetrock in the lift shaft.
Kelley Kern attaches some smaller pieces of sheetrock to the exterior of the elevator shaft in the addition.
The elevator shaft in the new building has now been completely sheetrocked.
Kerry Kern cuts the sheetrock to size and feeds the pieces in to Korey.
Mike Protelsch stands on scaffolding to attach pieces of sheetrock to the harder to reach areas of the lift shaft.
Kerry Kern puts the finishing touches on the sheetrock in the lift shaft.
Kelley Kern attaches some smaller pieces of sheetrock to the exterior of the elevator shaft in the addition.
The elevator shaft in the new building has now been completely sheetrocked.
Saturday, March 19, 2011
Riverview Men and Women Get To Work
Joy Lang staples poly membrane to the studs. The membrane will protect the sheetrock from moisture.
Tim Olson and Kerry Kern joke around as Kerry applies an adhesive for the membrane.
Tim staples the membrane to the studs.
Matt Conway cuts the membrane into appropriately sized sheets to fit the walls in the small rooms on the first level of the addition.
Mike Johnson applies adhesive to the base of the walls on the second level in preparation for the membrane.
Work moves up to the second level, and Tim Olson and Matt Conway have at it.
Tim Olson and Kerry Kern joke around as Kerry applies an adhesive for the membrane.
Tim staples the membrane to the studs.
Matt Conway cuts the membrane into appropriately sized sheets to fit the walls in the small rooms on the first level of the addition.
Mike Johnson applies adhesive to the base of the walls on the second level in preparation for the membrane.
Work moves up to the second level, and Tim Olson and Matt Conway have at it.
Tuesday, March 1, 2011
Let the Walls Fall Down
Larry Magnuson and Matt Glewwe chip away at the wall in the entryway/Narthex.
Chris Patrick cuts through cement blocks as Matt Glewwe vacuums up the dust created by the saw.
This picture was taken from the entryway doors. Without the wall the Narthex is all of a sudden quite a bit bigger!
In the meantime, Korey Kern and Mike Protelsch begin sheetrocking the ceiling of the second floor of the new addition.
Chris Patrick cuts through cement blocks as Matt Glewwe vacuums up the dust created by the saw.
This picture was taken from the entryway doors. Without the wall the Narthex is all of a sudden quite a bit bigger!
In the meantime, Korey Kern and Mike Protelsch begin sheetrocking the ceiling of the second floor of the new addition.
Labels:
Ceiling,
Century 2.2,
Demolition,
Faces,
Narthex,
Sheetrock,
Video
Monday, February 28, 2011
Framing, Painting, and Sheetrock
Mike Johnson's crew continues to frame the new entryway.
Meanwhile, inside, the painter covered the pews with plastic to get ready to paint the newly installed sprinkler pipes.
While all that was taking place, Kerry and Korey Kern were prepping the ceiling of the second level of the addition for sheetrock.
Meanwhile, inside, the painter covered the pews with plastic to get ready to paint the newly installed sprinkler pipes.
While all that was taking place, Kerry and Korey Kern were prepping the ceiling of the second level of the addition for sheetrock.
Labels:
Century 2.2,
Construction,
Exterior,
Faces,
Interior,
North Entry,
Sprinkler,
Video
Friday, February 25, 2011
Day 65
The Overflow Room will unfortunately be unusable for Sunday Service this week. The room is currently filled with pipes and tools for the new sprinkler system.
A view of the interior of the new link.
The same view, except taken from the other end of the link, through the missing wall of the pastor's office.
Mike Johnson's crew has begun framing the new main entryway.
Ray Glewwe removes one of the coat racks from the narthex.
A view of the interior of the new link.
The same view, except taken from the other end of the link, through the missing wall of the pastor's office.
Mike Johnson's crew has begun framing the new main entryway.
Ray Glewwe removes one of the coat racks from the narthex.
Labels:
Century 2.2,
Demolition,
Faces,
Interior,
Link,
Sprinkler,
Video
Monday, February 21, 2011
Sprinklers
The weekend brought 12 inches of new snow with it, so not much work was taking place outside on Monday morning.
The sprinkler crew continued to install the new sprinkler system on Monday morning. Here a worker is drilling a big hole through a wall in one of the nursery rooms. Pipes will run down the nursery hallway and sprinklers will be installed on the walls of each nursery and preschool room.
The pipes and equipment for the sprinkler system that will be installed in the sanctuary.
Workers install pipe for the sprinkler system at the very top of the sanctuary ceiling.
Some pews had to be removed so the lift could be properly positioned.
The black pipe running diagonally through the picture is the main pipe that will feed the sprinkler system in the sanctuary.
The sprinkler crew continued to install the new sprinkler system on Monday morning. Here a worker is drilling a big hole through a wall in one of the nursery rooms. Pipes will run down the nursery hallway and sprinklers will be installed on the walls of each nursery and preschool room.
The pipes and equipment for the sprinkler system that will be installed in the sanctuary.
Workers install pipe for the sprinkler system at the very top of the sanctuary ceiling.
Some pews had to be removed so the lift could be properly positioned.
The black pipe running diagonally through the picture is the main pipe that will feed the sprinkler system in the sanctuary.
Tuesday, February 15, 2011
Link
Work continues on the link between the existing building and the addition. Mike Johnson and crew continue framing, while other works cut through one of the exterior walls of the pastor's study.
Labels:
Century 2.2,
Construction,
Faces,
Frame,
Link,
Video
Friday, February 11, 2011
Pour the Floor
The floor of the addition was poured on the coldest day of the year: -13 degrees. Here the ground is prepared for the concrete.
The finishing touches being applied to the newly poured concrete.
The finishing touches being applied to the newly poured concrete.
Monday, February 7, 2011
A Hole in the Floor
Crews finished cutting through the concrete floor in the music office this morning to make way for the new lift.
Here's some footage of the actual cutting. You may want to turn the volume down on your computer...
The finished job.
View up into the Music Office from the basement through the newly cut hole.
The future location of the lift on the basement level.
Here's some footage of the actual cutting. You may want to turn the volume down on your computer...
The finished job.
View up into the Music Office from the basement through the newly cut hole.
The future location of the lift on the basement level.
Labels:
Century 2.2,
Construction,
Demolition,
Interior,
Lift,
Video
Monday, January 31, 2011
More Snow
Monday brought 3-6 inches of snow with it, but most of the workers are either in the main building or in the addition today. Below, Ray Glewwe explains some of what the plumbers are up to in the new addition.
Sawing through some brick.
Sawing through some brick.
Labels:
Century 2.2,
Cold,
Construction,
Exterior,
Interior,
Video
Friday, January 28, 2011
Days 44-45
Here's a look at some of the work that happened on Thursday and Friday of this week. First, Mike Johnson's crew tar papers the exterior of the addition.
Workers broke through the walls and floors to get at the sewer line. This picture was taken from outside the door at the end of the nursery wing hallway.
This picture was taken outside the 4-5 year old room, looking at the same guy. The plastic is up to minimize the dust and dirt that gets flung into the air.
Bill Heinemann removes ceiling tiles from one of the preschool rooms.
Chris Patrick begins the demolition of the music office, which is also the future location of the lift. Crews will begin to cut through these walls in the coming weeks.
Workers broke through the walls and floors to get at the sewer line. This picture was taken from outside the door at the end of the nursery wing hallway.
This picture was taken outside the 4-5 year old room, looking at the same guy. The plastic is up to minimize the dust and dirt that gets flung into the air.
Bill Heinemann removes ceiling tiles from one of the preschool rooms.
Chris Patrick begins the demolition of the music office, which is also the future location of the lift. Crews will begin to cut through these walls in the coming weeks.
Labels:
Century 2.2,
Demolition,
Exterior,
Faces,
Interior,
Lift,
Video,
Windows