A worker heats up a pipe to be installed.
Insulation has been put in place on the second level of the new addition.
Workers install doors in the new link.
All of the windows for the new link have been installed.
Kerry Kern does the "mudding" for the newly hung sheetrock in the Narthex.
Showing posts with label Windows. Show all posts
Showing posts with label Windows. Show all posts
Friday, March 18, 2011
Day 80
Labels:
Century 2.2,
Doors,
Faces,
Insulation,
Link,
Sheetrock,
Windows
Tuesday, March 15, 2011
Windows
This window is at the top of the stairwell, facing north. The roof you see is that of the new link.Windows are installed on the second floor of the addition.

This is the south wall on the second level, overlooking the back parking lot.
This is the south wall on the second level, overlooking the back parking lot.
Tuesday, March 8, 2011
Days 71 and 72
Mike Johnson installs door frames on the first level of the addition.
Workers dig a trench for an underfloor heating duct in the new link.
Glass for the new building has arrived.
Matt Glewwe, Mike Johnson, and Ray Glewwe discuss details of the new entryway with the project supervisor.
Workers dig a trench for an underfloor heating duct in the new link.
Glass for the new building has arrived.
Matt Glewwe, Mike Johnson, and Ray Glewwe discuss details of the new entryway with the project supervisor.
Labels:
Century 2.2,
Construction,
Doors,
Faces,
Link,
Windows
Tuesday, February 15, 2011
Day 57
Here you can see the work that was done yesterday to remove the windows and part of the wall from the pastor's study...
The framing for the new link continues...
The stairs are coming along nicely...
The southern side of the addition on day 57...
Insulation for the new addition arrives and is ready to be installed...
The framing for the new link continues...
The stairs are coming along nicely...
The southern side of the addition on day 57...
Insulation for the new addition arrives and is ready to be installed...
Friday, January 28, 2011
Days 44-45
Here's a look at some of the work that happened on Thursday and Friday of this week. First, Mike Johnson's crew tar papers the exterior of the addition.
Workers broke through the walls and floors to get at the sewer line. This picture was taken from outside the door at the end of the nursery wing hallway.
This picture was taken outside the 4-5 year old room, looking at the same guy. The plastic is up to minimize the dust and dirt that gets flung into the air.
Bill Heinemann removes ceiling tiles from one of the preschool rooms.
Chris Patrick begins the demolition of the music office, which is also the future location of the lift. Crews will begin to cut through these walls in the coming weeks.
Workers broke through the walls and floors to get at the sewer line. This picture was taken from outside the door at the end of the nursery wing hallway.
This picture was taken outside the 4-5 year old room, looking at the same guy. The plastic is up to minimize the dust and dirt that gets flung into the air.
Bill Heinemann removes ceiling tiles from one of the preschool rooms.
Chris Patrick begins the demolition of the music office, which is also the future location of the lift. Crews will begin to cut through these walls in the coming weeks.
Labels:
Century 2.2,
Demolition,
Exterior,
Faces,
Interior,
Lift,
Video,
Windows
Wednesday, January 26, 2011
Shingles
This crane was used to hoist the shingles up to the roof.
Packs of shingles are spread out and ready to be attached to the roof.
Ray Glewwe heckles the roofers.
Packs of shingles are spread out and ready to be attached to the roof.
Ray Glewwe heckles the roofers.