All of the doors have been hung in the new addition, although they are still missing doorknobs and windows.
Lots of Riverview volunteers put in some work this week to get the whole addition completely painted. Good work, people. This is the future home of the Youth Directors' office.
The new entryway and exterior of the main office in the new addition.
A view of the Fellowship Hall from the stairway of the new addition. The elevator and second level of the addition will be accessible through this doorway.
Showing posts with label Painting. Show all posts
Showing posts with label Painting. Show all posts
Friday, April 29, 2011
Friday, April 22, 2011
Third Coat
Much of the addition is receiving its third coat of paint today. Here Rick Hillegas climbs a ladder on top of a scaffold to reach above the new south entry.
Bill Heinemann touches up some spots next to the windows on the second floor.
Rich Factor paints along the door frames on the first floor.
Bill Heinemann touches up some spots next to the windows on the second floor.
Rich Factor paints along the door frames on the first floor.
Monday, April 18, 2011
Painting and Waterproofing
Tim and Erik Olson apply another coat of paint to the walls around the new lift.
Darren Glewwe spreads some waterproofing compound on the exposed cement blocks that will soon be covered over with dirt.
Darren Glewwe spreads some waterproofing compound on the exposed cement blocks that will soon be covered over with dirt.
Saturday, April 2, 2011
Saturday
Rich Erickson starts working on the IT portion of the building project: installing a new server, computers, and security cameras.
Joy Lang and Jim Martin Paint the walls around the new lift.
Bud Hildebrandt stretches out to measure for ceiling tiles.
Ray Glewwe inspects the ceiling tiles in the Overflow Room.
Workers don their stilts in order to mud and tape the sheetrock in the new link.
Joy Lang and Jim Martin Paint the walls around the new lift.
Bud Hildebrandt stretches out to measure for ceiling tiles.
Ray Glewwe inspects the ceiling tiles in the Overflow Room.
Workers don their stilts in order to mud and tape the sheetrock in the new link.
Friday, March 25, 2011
More Sheetrock and Some Painting
Kelley and Korey Kern and Mike Protelsch work on sheetrocking the stairwell of the new addition.
All of the sheetrocking on the second level of the addition has been completed.
One of the bathrooms on the second level of the addition.
Norm Glewwe sweeps up the dust created by the sheetrocking process.
Pastor Lang tapes off some of the woodwork in the preschool rooms in preparation for paint.
Rick Hillegas goes to work with the roller.
All of the sheetrocking on the second level of the addition has been completed.
One of the bathrooms on the second level of the addition.
Norm Glewwe sweeps up the dust created by the sheetrocking process.
Pastor Lang tapes off some of the woodwork in the preschool rooms in preparation for paint.
Rick Hillegas goes to work with the roller.
Tuesday, March 15, 2011
Painting
Larry Vidger, Chris Patrick, and Rich Factor go to work painting sprinkler pipes in the Fellowship Hall.