Day 92

The Kerns, along with Mike Protelsch, begin sheetrocking the first level of the new addition.



One of the workers straddles two ladders in order to reach his work.

Wednesday, March 30, 2011

Link and Entry

Korey and Kelley Kern continue to sheetrock the new link.

Mike Johnson drops the entryway ceiling so that electrical can be installed.

Tuesday, March 29, 2011

Sheetrock & Insulation

Kerry and Korey Kern and Mike Protelsch began sheetrocking the new link today.

Korey trims a piece of sheetrock to size. Sheetrocking is dusty, messy work, as you can see all the dust that is created here.

Mike Johnson went to work framing another room on the second level of the addition.

Norm Glewwe cuts pieces of insulation to size and then Matt Glewwe and Rick Hillegas put them in place in the rafters.


Monday, March 28, 2011

Day 86

June Glewwe stains some of the woodwork that was removed and then replaced.

Kerry Kern enjoys the afternoon sun while installing sheetrock in the new stairwell.

Some of the machinery and equipment for the new lift is in the process of being installed.

Friday, March 25, 2011

More Sheetrock and Some Painting

Kelley and Korey Kern and Mike Protelsch work on sheetrocking the stairwell of the new addition.

All of the sheetrocking on the second level of the addition has been completed.

One of the bathrooms on the second level of the addition.

Norm Glewwe sweeps up the dust created by the sheetrocking process.

Pastor Lang tapes off some of the woodwork in the preschool rooms in preparation for paint.

Rick Hillegas goes to work with the roller.

Tuesday, March 22, 2011

Sheetrock

Korey Kern screws sheetrock in place in the new lift. Notice all the dust in the air captured by the camera.

Kerry Kern cuts the sheetrock to size and feeds the pieces in to Korey.

Mike Protelsch stands on scaffolding to attach pieces of sheetrock to the harder to reach areas of the lift shaft.

Kerry Kern puts the finishing touches on the sheetrock in the lift shaft.


Kelley Kern attaches some smaller pieces of sheetrock to the exterior of the elevator shaft in the addition.

The elevator shaft in the new building has now been completely sheetrocked.

Friday, March 18, 2011

Day 80

A worker heats up a pipe to be installed.

Insulation has been put in place on the second level of the new addition.

Workers install doors in the new link.

All of the windows for the new link have been installed.

Kerry Kern does the "mudding" for the newly hung sheetrock in the Narthex.

Wednesday, March 16, 2011

Framing and Sheetrock

Mike Johnson surveys his framing work for the new lift. The dark square at the bottom of the shaft is newly poured concrete.

Korey Kern puts some elbow grease into removing a fixture to prepare to sheetrock a wall in the narthex.

Friday, March 4, 2011

Progress...

The sprinkler system that was installed in the sanctuary has been painted. While the pipes are still visible, they now blend in nicely with the woodwork.

The ceiling of the second floor of the addition has been completely sheetrocked.

The location of the elevator on the second level.

Tuesday, March 1, 2011

Let the Walls Fall Down

Larry Magnuson and Matt Glewwe chip away at the wall in the entryway/Narthex.

Chris Patrick cuts through cement blocks as Matt Glewwe vacuums up the dust created by the saw.


This picture was taken from the entryway doors. Without the wall the Narthex is all of a sudden quite a bit bigger!
















In the meantime, Korey Kern and Mike Protelsch begin sheetrocking the ceiling of the second floor of the new addition.