A cement truck showed up this morning to pour cement in the front entryway and the new link.
Showing posts with label Floor. Show all posts
Showing posts with label Floor. Show all posts
Wednesday, March 16, 2011
Friday, February 11, 2011
Pour the Floor
The floor of the addition was poured on the coldest day of the year: -13 degrees. Here the ground is prepared for the concrete.
The finishing touches being applied to the newly poured concrete.
The finishing touches being applied to the newly poured concrete.
Subscribe to:
Posts (Atom)