Kerry and Korey Kern and Mike Protelsch began sheetrocking the new link today.
Korey trims a piece of sheetrock to size. Sheetrocking is dusty, messy work, as you can see all the dust that is created here.
Mike Johnson went to work framing another room on the second level of the addition.
Norm Glewwe cuts pieces of insulation to size and then Matt Glewwe and Rick Hillegas put them in place in the rafters.
Showing posts with label Insulation. Show all posts
Showing posts with label Insulation. Show all posts
Tuesday, March 29, 2011
Sheetrock & Insulation
Friday, March 18, 2011
Getting Our Hands dirty
Labels:
Century 2.2,
Elevator,
Faces,
Insulation,
Volunteering
Day 80
A worker heats up a pipe to be installed.
Insulation has been put in place on the second level of the new addition.
Workers install doors in the new link.
All of the windows for the new link have been installed.
Kerry Kern does the "mudding" for the newly hung sheetrock in the Narthex.
Insulation has been put in place on the second level of the new addition.
Workers install doors in the new link.
All of the windows for the new link have been installed.
Kerry Kern does the "mudding" for the newly hung sheetrock in the Narthex.
Labels:
Century 2.2,
Doors,
Faces,
Insulation,
Link,
Sheetrock,
Windows
Friday, March 4, 2011
Partitions and Insulation
Korey, Kelley, and Kerry Kern installing partitions on the second floor.
Mike Johnson installing partitions on the first floor.
Norm Glewwe and Bill Heinemann feed insulation into the blower...
...which Matt Glewwe blows into the rafters.
Mike Johnson installing partitions on the first floor.
Norm Glewwe and Bill Heinemann feed insulation into the blower...
...which Matt Glewwe blows into the rafters.